I had placed plenty of thought for the content of the script and it had taken many takes before I gave the final piece to the group. The target audience was aimed for all members of a family therefore I did not want to go into the mechanics because many children would not know what or care about the mechanics of a crankshaft. The soundtrack consisted of an introduction, middle and end under the principles of What, How, and Why.
I must say that I was shocked to realise that it sections out as it was a short piece. I had not realised it had been cut until the week prior to the presentation so at this stage I really was becoming disheartened and confidence was diminishing fast. The sound file will be included with my files.
The other source of frustration was the sound I had spent many hours finding noises which related to the mines and emailed them to the group and yet none were used but aliens had landed in the piece instead.
This was brought up in my view of the assembled piece but I was over ruled on my dislike of the accompanying sound. I felt that the sound needed to be more in keeping with the subject and that period of time for the sound piece to contribute to the model.
Meeting On the Day of the Presentation
I was not looking forward to this, but I had worked on my part of the presentation the day before trying to get it word perfect because I did not want to let anyone down.
The agreement was to meet in Room C26 at 11-00 so that we could do the last dummy run and then load the presentation onto the computer at 12-00 in readiness for the presentation.
This did not happen I was running around the library trying to find other members for over half an hour and eventually found them in one of the computer rooms upstairs. The dummy run needless to say never happened and apparently the model had broken apart or something so they had redone something to do with the video/animation I did not get to know what had been changed.
Therefore my dread and anxiety had been heightened and to be honest I had died inside. I was a spare part seen but not heard.
Presentation
The model for the simplistic view of its mechanics had lost its definition and I felt that the content of my spiel was irrelevant and incomprehensive because I was trying to describe sections that had turned into a mass of white blur.
There was no point in me mentioning how it worked when nobody could see what I was talking about therefore it could be heard that I was becoming disengaged and I had to force myself to continue. This was not a pleasurable experience.
The rest of the team spoke very well with confidence and conviction.
The overall model build was reasonable; the difficulties experienced in the animation could have been eased if all members had been involved with the process.
The machine was out of sync and certain elements of the animation were not moving when they should have been. It was a brave attempt but it was incorrect.
I feel that time is not an issue when producing anything within reason because in the workplace tight deadlines are the norm and often in my last place of work I would be programming through the night at my place of work and still have to work the next day especially when new software was running in parallel.
I feel that light is not an issue because if you were demonstrating in a clients workplace you would not know their lighting arrangements and this would be something to address in the creative stages.
We were reminded about how we should render but it had fallen on deaf ears.
All in all I liked the mixture of personalities within the group, but never felt that I had been accepted.
Reflection
I thoroughly enjoyed the modelling but did not enjoy group work as it does not reflect for me a true workplace experience. My modelling is improving but I do have a long way to go.
I can see the point of groups and why it is part of the learning process but some of the students even at this stage have not grown to share, communicate or accept the tasks and work necessary for a team to work as one.
Steve Smiths - email account of the Environment at Bedwas
Hi
You are really pushing my memory cells this time.
Bedwas coke works was located next to the Bedwas colliery. Upon Nationalisation in 1947, the coke oven site remained as a private company and traded under the name of British Benzole and Coal Distillation Ltd if my memory serves me. It was one of two plants, the other I think was Randolph in Barnsley.
The Bedwas plant specialised in the manufacture of Foundry coke, that is special coke suitable for the production of iron castings and the coke was made from selected coals to give a large coke of nominally 4 inch and larger cubes. Bedwas coal was ideal hence why the site was build there in the first place. Interestingly the work force belonged to the NUM cokemans' area, the same branch of the NUM as our guys at Caerphilly Tar Plant. Towards the end it was purchased by the Coalite coke and chemical works at Bolsover in Derbyshire.
In the early 1950's there was a large NCB rebuilding program where several older coke works were shut, and two new ones were built and the other extended.
Prior to the Second World War tar distillation was also centralised at a new green field works at Caerphilly and smaller tar works closed at many of the coke works including Bedwas.
So the Bedwas site was quite old by NCB standards and little investment carried out especially from the 1950's. The only significant change I can remember is when natural gas arrived and all the coke works had to find new markets for their coke oven gas. Nantgarw, Cwm and Coedely combined and built a new gas pipeline to serve the East Glamorgan hospital, the Treforest Trading Estate power station and a light bulb factory. On the other hand Bedwas coke works and Caerphilly tar plant got together and a pipeline was built to supply Caerphilly with gas right up to the end.
Now regarding the pump, 26900 was sited on a plinth within a bunded tank farm containing the coal tar storage tanks. Most sites in South Wales are built on sloping ground with the front above ground level and the back cut into the hill side. The tanks were 30 feet by 9 feet diameter and I believe there were several in the tank farm at least 4 although only one was in regular use at the end. The floor of the tank farm was mainly below ground level, but the tanks elevated by several feet so that the pump suction pipe was always full of tar. The plinth was about 3 feet above floor level and 26900 was placed on the plinth. This plinth was reached by a metal walk way from the out side of the bund. The delivery pipe then run up and over the wall to end in a vertical delivery pipe originally for loading straight into rail tanks for transfer to Caerphilly. In the mid 1960's and the Beeching era, the direct line from Bedwas to Caerphilly was shut, along with the loco and carriage works at Caerphilly so the only rail route was the long way round, that is from Bedwas to Newport, then Cardiff then back up the valleys to Caerphilly via Radyr. About 30 miles at least compared to 3 miles by road - no contest! The track was concreted over and used by road vehicles from that time to closure. About 3 loads per week, say 55 tonnes of coal tar/week
The pump was regarded as too small for loading purposes and often it took over 2 hours to load 18 tonnes; not a popular trip for the drivers. The pump was out in the open although there were a few asbestos sheets on a steel frame over the top to keep the rain off. I gather in very cold weather it took ages to get the steam through to the pump and to warm it up to start the tar flowing! So I'm afraid the facilities were basic to say the least, all manually controlled. At least at Caerphilly the pumps were inside a brick building.
The pump was rescued by myself in 1987 for the sum of £10. It was in a filthy state and well worn, but as it was my first rotative steam pump that I acquired and the first to be restored I still have a soft spot for it. I can distinctly remember this day as the works had been shut for over 3 months by now and the bund was full of water to a depth of about 3 feet, so the only way I could dismantle the pump was to find an empty oil drum, carefully sink it on its end adjacent to the plinth, and then by tying string to my spanners (incase I dropped them into the dirty water) I stood on the drum to undo all the fixing bolts and I still got wet feet!
I apologise if I go on a bit but it's nice for someone to actually ask about these details. The 1950's to 1970's were a fascinating period in our industrial history and 'easy to take' photography was simply not available in those days.
Please do not hesitate to ask if you require any further info.
Meanwhile over the week end I have taken more photos. Please delete them if you do not need them. The Pickering Governor at the Museum is the larger version, too big for 26900. The attached photos are of an unrestored governor, sizes 3/4 inch which would have been used on this size of pump.
Photos are 3/4 inch Pickering Governor Nos. 3076 to 3083
Pump chassis another one waiting to be cleaned but one can see how the two cylinders, crank shaft and bearings drop into place. Nos 3085 to 3088
Various photos of another similar pump that I have just finished restoring, photos 3089 to 94 without the flywheel and 3095 to 3101 with the flywheel
Again sorry if I've rambled on a bit
Regards Steve






























